Contract Number:
071169
Estimated Cost Range:
Estimated cost range is $420,300 to $490,300, plus Washington State Sales Tax (WSST).
Procurement Summary:
The Fiber to Lot F consists of installation of two (2) 48-strand fiber optic cables from the Husky Administration Building to a new communications hut located on Lot F. Re-loading documents from Addendum #1 1.2.20, Q&A #1 posted 1.3.20
Contact:
Notes:
Note-Advertisement revised to include: The Port has been awarded a Department of Homeland Security Grant for the work. Provisions and requirements associated with the grant are included within the Supplemental Conditions attached to the specifications.
NOTE- Pre-Bid begins at Port's Administration building. Posted Pre-Bid sign sheet, Hold Harmless and Addendum #1 12.18.19, Holder List posted 1.7.20, Bid Tab posted 1.7.20
NOTE- Pre-Bid begins at Port's Administration building. Posted Pre-Bid sign sheet, Hold Harmless and Addendum #1 12.18.19, Holder List posted 1.7.20, Bid Tab posted 1.7.20
Bids Due:
Questions Due:
Documents: